Staging Installation (rear)
Slide three bolts into each of
Internal
the last two slats and slot
them into place. Line the
staging support brackets
(EV1124M) up with the bolts
on the 2nd slat in from the
front and attach nuts to
both.
Diagram 143
Diagram 144
Internal
Dia. 144
Dia. 145
Make sure all the staging
slats are level before fixing
the diagonal support with a
large head 25mm screw
(diagram 145).
When you are happy with
the position of the infill
staging section tighten all of
the nuts.
Diagram 145
15
56
Need help?
Do you have a question about the Evolution Octagonal 9x9 and is the answer not in the manual?