Side Assembly
You now need to attach the last two glazing bars
(EV0970) onto the front eaves section (EV0965). Drill
two pilot holes in the outside face of the eaves bar into
the mortice holes, then slot the top of the glazing bars
Top View
into the mortise hole and fix with a 40mm countersunk
screw (diagram 23).
Slot the assembly into place, locating the bottom of
the glazing bar onto the tenons of the cill sections
(EV1035) (diagram 24). Drill pilot holes in the end of
the eaves bar again and then fix with 40mm CSK
screws.
EV0965
Dia. 23
EV1035
EV1035
Diagram 22
Dia. 24
External
Diagram 23
4
External
Diagram 23
Diagram 24
13
Need help?
Do you have a question about the Evolution Octagonal 9x9 and is the answer not in the manual?