Alton Evolution Octagonal 9x9 Instruction Manual page 41

Table of Contents

Advertisement

Glazing (part 1)
Before you install the large panes it helps to place each 1028mm long bar capping around the
building ready for installation. When ready, insert the large side pane next to the louvre (diagram
101). If this is difficult try loosening off the middle screws on the eaves bracket indicated by the
arrows on diagram 103. Remember to tighten all the screws after glazing the sides, but don't over
tighten them!
Dia. 103
Diagram 102
Dia. 103
EV795X392
With the large pane in position you can now install
the first piece of bar capping. This capping is fitted
to the glazing bar with 40mm Pan head screws and
should be as far down the glazing bar as possible,
touching the mid rail. This will leave a gap at the
top, as shown in diagram 103.
41
Diagram 103
External
Diagram 101
12

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evolution Octagonal 9x9 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Evolution octagonal

Table of Contents