Alton Evolution Octagonal 9x9 Instruction Manual page 49

Table of Contents

Advertisement

Glazing (part 2)
Work around the building securing the glass
with the bar capping using 40mm pan head
screws.
When you get to the glazing bars in the middle
of a 4' section as before with the sides these
use a slightly different capping (diagram 118
& 119).
If you haven't already done so you can now
install the louvre glass, 6 per louvre. From the
inside of the building carefully slide each piece
(525 x 100mm - D729TG) into the louvre
frames glass retainers until it hits the small
stop either side.
Diagram 120
Section
Section
49
EV0983
Diagram 118
Glazing
Rubber
EV0993M
Diagram 119
External
14

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evolution Octagonal 9x9 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Evolution octagonal

Table of Contents