Staging Installation (rear)
Now fit the infill staging arms (EV1123M) to the small brackets on the rear of the building with 10mm
nuts and bolts. Don't fix to the staging support bracket yet, just use this to support the arm while
you fit the first couple of slats, diagram 142. Slide three 10mm bolts into each of two infill staging
slats (EV1116M) and position them as shown in diagram 141. Loosely attach these for now as you
may need some adjustment.
Internal
Dia. 142
Internal Diagram 142
EV1116M
EV1116M
55
Diagram 141
Attach two diagonal
supports (EV0350M)
to the last hole in
the infill staging arm
(diagram 142).