Glazing (part 1)
If you have the optional aluminium bar capping you
need to insert the rubber into the rubber channels and
trim it to length (diagram 99). Begin glazing the sides
of the building by inserting one of the narrow panes
(EV610x76) next to the louvre frame. If you have the
louvre in the mid level position as below you also need
to install the glass above the louvre (EV795X392).
Section
EV0990M
Section
12
Diagram 98
EV0980
Glazing
Rubber
Diagram 99
Diagram 100
Dia. 100
40
Diagram 97
EV795X392
Need help?
Do you have a question about the Evolution Octagonal 9x9 and is the answer not in the manual?