Alton Evolution Octagonal 9x9 Instruction Manual page 21

Table of Contents

Advertisement

Roof Assembly
With help position the lower roof frame
assembly onto the building (diagram
43).
See diagrams 44 and 45 for the fixing
down of the roof bars to the sides
making sure they are pulled tight into
the side glazing bars leaving no gap.
When in position drill vertically down in
the location shown in diagrams 45 and
46. Then fix with a 80mm CSK screw.
Work your way around the building
until all roof bars are fixed.
Diagram 43
X 8
X 8
Internal
Diagram 44
Diagram 45
External
8
21
X-ray
Diagram 46

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evolution Octagonal 9x9 and is the answer not in the manual?

This manual is also suitable for:

Evolution octagonal

Table of Contents