Board Installation - Alton Evolution Octagonal 9x9 Instruction Manual

Table of Contents

Advertisement

Board Installation

If you have purchased the low level louvre you can either fit it
now or simply leave out the board where you want the louvre
to be positioned and fit it later.
To fit the boards slot the top edge into the mid rail (the top of
the board has the baton closest to the edge), then push the
bottom of the board in until it touches the frame. The board
will drop slightly and the bottom baton will rest on the cill.
Work your way around the building until all the boards are in
place. Once in position you can fix them with the cedar panel
capping (EV0979), diagram 38. This capping is used all around
the building apart from either side of the door and in the
middle of the 4' sides where special (EV0985) capping is used
(diagram 40). Fix the capping in place with 40mm Pan head
screws.
Diagram 38
Diagram 37
Optional low Level louvre? See special help sheet.
Dia. 38
Dia. 40
19
EV0979
Section
Diagram 39
EV0985
Diagram 40
Section
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Evolution Octagonal 9x9 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Evolution octagonal

Table of Contents