How To Setup The Data Source For The Pitch/Roll Data - Furuno ENVISION AR-100M Operator's Manual

Ar navigation system
Table of Contents

Advertisement

2. INSTALLATION AND INITIAL SETTINGS
4. Adjust the slider bar for [Position] to set the bow position calculated from the loca-
tion of the EPFS device to use as a reference.
• [X]: Set the port-starboard (lateral) location of the bow, which is calculated from
the location of the EPFS device.
• [Y]: Set the bow-stern (longitudinal) location of the bow, which is calculated from
the location of the EPFS device.
5. Close the main menu.
2.3.5

How to setup the data source for the pitch/roll data

Do as follows to setup the data source for the pitch/roll data.
1. Login as a service technician, referring to
subsection 2.3.1.
2. Click [Service Setting].
3. Click [Network].
4. Click [Sentence].
5. Click [Pitch/Roll].
6. Enter the SFI (System Function ID) of the
equipment that outputs the GPatt sentence
in the [SFI] field.
The AR navigation system is also compati-
ble with the following SFI talkers:
• GP
• HE
7. Click the [Commit & Reset] button to apply the settings.
The AR navigation system application is automatically reset.
2-14
• GL
• GA
• HN
• HC
• GN
• VD

Advertisement

Table of Contents
loading

Table of Contents