Figure 69. Installing the mezzanine card bridge board
Next steps
1
Install the mezzanine
2
Install the expansion card riser
3
Follow the procedure listed in
Removing the OCP card
Prerequisites
NOTE:
The procedure to remove the mezzanine blank is similar to the removal of a mezzanine card.
1
Follow the safety guidelines listed in
2
Follow the procedure listed in
3
Remove the mezzanine
Steps
1
Push the blue retention clips away on one side and release the Open Compute Project (OCP) card.
Repeat step 1 to release the card from the clips on the other side.
2
Slide the card toward the front of the sled to disengage the connectors from the chassis and lift the card up.
card.
assembly.
After working inside your
Safety
instructions.
Before working inside your
card.
enclosure.
enclosure.
Installing and removing enclosure components
119