Landoll Brillion BH1020 Operator's Manual page 16

Bridge hitch
Table of Contents

Advertisement

ASSEMBLY
PFT Series Hydraulic Cylinder
Installation
Attach the base end of the Pulverizer Hydraulic Cylinder to
the Bridge Hitch Lug and the rod end of the Hydraulic
Cylinder to the Pulverizer lug. It may be necessary to
extend the cylinder rod or raise the frame slightly to make
2-6
Figure 2-6: PFT Series Hydraulic Cylinder Installation
this connection. Use the cylinder pins packaged with the
cylinder to attach the cylinder to the machine. Be sure to
bend the cotter pins so that the cylinder mounting pins
cannot disengage.
Mount the Transport Lock on the Bridge Hitch Channel
and secure with Bent Pin and Hairpin Cotter.
F-778

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brillion pft series

Table of Contents