53-1002177-19 Hardware Installation Guide
Powering off the chassis
Perform the following steps to power off the chassis.
1. Shut down the chassis using the
switch::admin> sysshutdown
This command will shutdown the operating systems on your switch.
You are required to power-cycle the switch in order to restore operation.
Are you sure you want to shutdown the switch [y/n]?y
HA is disabled
Stopping blade 1
Shutting down the blade....
Stopping blade 2
Shutting down the blade....
Stopping blade 8
Shutting down the blade....
Broadcast message from root (pts/1) Tue Aug 23 14:23:06 2010...
The system is going down for system halt NOW !!
2. Power off the chassis by flipping the AC power switches on the power supplies to O (LEDs inside AC power switches
should turn off). To maintain the ground connections, leave power cords connected to the power supplies and to the
electrical outlets.
Broadcom
command.
sysShutdown
Brocade DCX 8510-4 Backbone Hardware Installation Guide
53-1002177-19
80