Secure to Ground
!
sure the foundation is FLAT and LEVEL. Make sure the greenhouse is square.
The two diagonal measurements inside the greenhouse should be identical.
15
G01C at each corner and center of both sides. Place the S35 pegs through the holes and into
the ground to establish proper placement. Remove the pegs, dig holes 12"/30cm deep and
way into the concrete and let dry completely for twenty four hours.
G01C
S34
VIEW FROM INSIDE.
www.stcny.com
G01C at a slight angle and slide under the lip of the channel.
G01C
S35
Anchor Clip
#S34
49 of 50
Anchor Peg
QTY
6
#S35
QTY
6