STC Clear View Assembly Instructions Manual

6’ x 8’ greenhouse

Advertisement

Quick Links

7
10
Clear View
6' x 8' Greenhouse
Assembly Instructions
Systems Trading Corporation
450 7th Avenue Suite 2809, New York, NY 10123
Customer Service: (877) 407-9100 ext 1 Email: customerservice@stcaustin.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Clear View and is the answer not in the manual?

Questions and answers

Roderick A Smith
March 26, 2025

Are panels still available for the 6' x 8' model. Thanks

Summary of Contents for STC Clear View

  • Page 1 Clear View 6’ x 8’ Greenhouse Assembly Instructions Systems Trading Corporation 450 7th Avenue Suite 2809, New York, NY 10123 Customer Service: (877) 407-9100 ext 1 Email: customerservice@stcaustin.com...
  • Page 3: Introduction

    Introduction Thank you for purchasing your ClearView 6x8 Greenhouse. When properly assembled and maintained, this greenhouse will provide years of enjoyment. These instructions include helpful hints and important information needed to safely assemble and properly maintain the greenhouse. Please read these instructions completely before you begin. Our patented greenhouse has been designed to be easily assembled.
  • Page 4: Table Of Contents

    Safety Advice Table of Contents Introduction ......... surface. Safety Advice ........Dispose of all plastic bags safely. Keep them out of the reach of General Order of Assembly .... List of Parts ........... small children. Assemble Back ........Keep children and pets away from the assembly area until the Prepare Door ........
  • Page 5: List Of Parts

    Place all the parts for each step in staging areas, checking that you have all parts as you go. If any parts are missing or damaged, contact STC customer service before beginning assembly: Customer Service: (877) 407-9100 ext. 1 or email: customerservice@stcaustin.com.
  • Page 6 Clear Panel Clear Panel Step 3 Step 1 Step 1 Step 3 Step 1 GY12 Step 12 Step 1 GY13 Step 12 Step 3 GY15 Step 3 Door Hinge Parts Step 3 Step 14 #S49 Step 14 #S50 Step 14 Step 1 #S51 Step 14...
  • Page 7 Connector Connector Steps 1,3,4 Steps 3,4 Steps 1,4 Step 4 Step 1 Steps 1,3 S17L Step 3 Steps 1,3 Steps 1,3 S17R Step 3 Steps 1,3 Step 4 Step 1 Step 9 Step 3 Steps 5,15 Step 4 Connector Steps 1,3,4,9 Steps 1,9 Step 9 Steps 1,9...
  • Page 8: Assemble Back

    Assemble Back Lay out all the parts for the back face in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. The back is assembled with the outside face to the ground.
  • Page 9 1.3A channels lining up last hole of S01 with holes in G17D. G03C G02B G03D G17C G17C G02A G17D 1.3B Secure with four S02 screws. G03C G03D G02B G02A G17C G17D NOTE: ALL VIEWS ARE FROM INSIDE. Screw #G17C #S02 #G17D www.stcny.com 7 of 50...
  • Page 10 1.4A 1.4B Secure with four S02 screws. G02B G03C G03D G02A NOTE: ALL VIEWS ARE FROM INSIDE. Connector #S02 #S08 Slide connectors P04 and P05 into profile G01B until they securely click into place. Connectors P04 and P05 CLICK into place. G01B G01B G01B...
  • Page 11 Remove protective plastic from both sides of panels GY2 . The clear panels are designed with window shapes that curve outward. Place the outward curved side facing G03C G03D G02B G17C G03D, G17C and G17D. G02A G17D Remove protective plastic from EACH side of clear panels before installing.
  • Page 12 1.8A 1.8B Screw hex nut S14 onto bolt. Do not completely tighten. G05B G05B Bolt/Nut #S13 #G05B #S14 1.9A 1.9A Remove protective plastic from both sides of panels GY3, GY4, GY7 and GY8. The clear panels are designed with window shapes that curve outward. Place the outward curved side facing down. The Remove protective plastic from EACH side of clear G05B panels before installing.
  • Page 13 1.10 Slide hex nut S14 and hex bolts S13 into U-cutout in side of NOTE: ALL VIEWS ARE FROM INSIDE. 1.11A G02C G02C G02D G02C G02D 24.5” 24.5” (623 mm) (623 mm) IMPORTANT: The holes are not at the midpoint portion will be the bottom when standing.
  • Page 14 1.11B together making surepanels GY4, GY7 and GY8 fit into Connectors P09 and P10 CLICK into place. G02B G02A 1.12A and G02D and G03C matching up all holes. 1.12B Screw S02 screws partially into bottom two holes. Do not tighten. 1.12C Screw S02 screws into top two holes.
  • Page 15 1.13A connector to other side of channel. Use hex key to securely tighten and hold in place. NOTE: ALL VIEWS ARE FROM INSIDE. GY87 G17C G17D 1.13B side of cable to another S06 cable connector. With hook facing the center, insert connector into Use hex key to securely tighten and hold in place.
  • Page 16: Prepare Door

    Prepare Door Lay out all the parts for the door in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. installing.
  • Page 17 Place brace G15A onto DOOR 3G lining up the holes on each end with the holes in brace with two S52 screws and S14 hex nut. G13B G13B DOOR 3G G15A G13A G13A IMPORTANT: The hole for hex bolt is not at the midpoint of brace. Turn brace until all holes line up.
  • Page 18: Assemble Front

    Assemble Front Lay out all the parts for the front face in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. The front is assembled with the outside face to the ground.
  • Page 19 3.2A not snap into place. 3.2B Place connectors S17L and S17R on corners matching up bottom two holes with holes G06C G06C S17L S17L G06B S17R G06B G06A S17R G06B G06A G06A 3.2C Secure each connector with two S52 screws. S17R S17L Connector...
  • Page 20 Connectors P09, P10 and P18 CLICK into place. G02E G02F 26.8” (680 mm) 26.8” (680 mm) Connector Connector Connector #G02E #P09 #P10 #P18 #G02F Remove protective plastic from both sides of panels GY5, GY6 and GY15. The clear panels are designed Remove protective plastic from EACH side of clear panels before installing.
  • Page 21 3.6A Slide connectors P09 and P10 half way into profiles G02A and G02B. Continue sliding together making sure the ribbed edges of panels GY5, GY6 G02F and GY15 fit into the V-channels of profiles G02E G02F and G02E. Connectors click securely into profiles. GY15 G02B G02A...
  • Page 22 Remove protective plastic from both sides of panels GY1 and GY9. The clear panels are designed with window shapes that curve outward. Place the outward Remove protective plastic from EACH side of clear panels before installing. Dispose of plastic properly. Install with outward curved side FACING DOWN.
  • Page 23 3.8A G01N G01Q G01M G01Q G01Q G01M Connectors P01 CLICK into place. G01N Connector IMPORTANT: Connectors P01 and P03 look very similar. P01 has #G01M built in nuts used to support door hinges installed in Step 14. #G01N #P01 MAKE SURE TO USE CONNECTOR P01 FOR THIS STEP. #G01Q 3.8B into place.
  • Page 24 As you slide bottom profiles G01M, G01N and G01Q half way into place, carefully line up P01 connectors with G06K and G06A and P04 and P05 connectors with profiles G02B and G02A. Continue sliding, Making sure panels GY1 and GY9 fit into V-channels.
  • Page 25 3.10A facing up. Slide connector to other side of channel. Use hex key to securely tighten and hold in place. NOTE: ALL VIEWS ARE FROM INSIDE. G06A G06B G02A G17A G17B G02B G01N G01Q G01M 3.10B 3.10C Use hex key to securely tighten and hold in place. IMPORTANT: Make sure all corners are squared at 90 degrees.
  • Page 26: Assemble Sides

    Assemble Sides Lay out all the parts for the sides in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. You are assembling both sides in the following steps.
  • Page 27 4.3A 4.3B Secure with three S02 screws. Repeat to make two sets. G07B G07B G07B G03B G03B L01C G01C G01C Screw #G01C #G07B #S02 4.4A 4.4B Slide another connector S01 so it lines L03A 4.4C Secure all pieces with S02 screws.
  • Page 28 4.5A 4.5B G04D until it snaps into place. Repeat to make two sets. G04D G04D Connector P39 CLICKS into place. Connector Connector #S01 #G04D #P39 #S02 Connector P03 CLICKS into place. Connector #G04B #P03 G04B 4.7A 4.7B Secure with two S02 screws. Repeat to make two sets. IMPORTANT: Connector P03 rests on top of connector G03A NOTE: ALL VIEWS ARE FROM INSIDE.
  • Page 29 4.8A connector S01 into channel of G04C. 4.8B Secure with S02 screw. Repeat to make two sets. Connector P39 CLICKS into place. G03A G04B G04C G04D Screw #S02 Repeat to make two sets. Connectors P01 and P19 CLICK into place. NOTE: ALL VIEWS ARE FROM INSIDE.
  • Page 30 4.10 Slide sections together as shown. Repeat to make two sets. G07A G07B G07B G07A G03A G01C G01C G01C NOTE: ALL VIEWS ARE FROM INSIDE. Connectors P01 and P39 CLICK into place. G01C NOTE: The two sides are identical. When you connect them to the back, there will be a right and left side.
  • Page 31: Prepare Shelves

    Prepare Shelves Place all the parts for the shelves on a level surface. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. 5.1A G14C G14C...
  • Page 32: Connect Sides To Back

    Connect Sides to Back With the outside facing a wall, carefully stand back up and lean against the wall. Stand each side up and place next to the back. Both sides are identical G07A and G07B match the diagrams before connecting. 6.1A G07B G14D into connector P39 until it clicks into place.
  • Page 33 6.2A G07A until it clicks into place. G14D G14C G14D G14C Connectors P03 and P39 CLICK into place. 6.2B side in until connectors click into place. Connector P10 CLICKS into place. G07A G07A G17D Secure connectors S37 to G14D G14C G01C G17D VIEWS FROM INSIDE.
  • Page 34: Connect Sides To Front

    Connect Sides to Front Keep the structure as is, with the back against the wall until you Connectors P03 CLICK into place. G14D G07A G07B G14D G14C Connectors P03 CLICK into place. G14C www.stcny.com 32 of 50...
  • Page 35 7.2A Lift front from inside and rest it next to sides. Line up connector P10 with G07A G14D G07B G01C G14C G01C 7.2B click into place. Connectors P09 and P10 CLICK into place. G07A G17B G07B G14D G07B G14C G01C G01C Connectors P04 and P05 CLICK into place.
  • Page 36 7.3A Connector P39 CLICKS into place. G14C 7.3B G07A Connector P39 CLICKS into place. G14D G17A G14D G14C 7.3C Secure S37 connectors to G17A G17B G14D G14D G14C G14C Screw VIEWS FROM INSIDE. #S02 www.stcny.com 34 of 50...
  • Page 37: Prepare Roof Vent

    Prepare Roof Vent Lay out all the parts for the roof vent in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. installing.
  • Page 38: Assemble And Connect Gables

    Assemble and Connect Gables and Roof Vent Lay out all the parts for the gables in a staging area. Make sure the pieces are in the correct positions before assembling. Please carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including shoes, gloves and goggles.
  • Page 39 From the inside of the greenhouse, use two people to carefully lower center gable onto frame. Line NOTE: U-shaped cutouts Connectors P19 CLICK into place. G03H G03G G03H G03G G03G From the inside of the greenhouse, use two people to carefully lower front and back gables onto frame. G03E G03E NOTE: U-shaped cutouts...
  • Page 40: Install Roof Vent

    9.5A connector P21 at a slight angle. G02M IMPORTANT: Have the roof vent nearby. You will install the roof vent BEFORE connecting both sides of G02M. It is best to use two people for this step. rectangular holes in channels face the LEFT when looking at the front of the greenhouse from the outside. 9.5B Slide NOTE: Roof vent is prepared in Step 8.
  • Page 41 9.7A From inside of greenhouse secure S20 connectors 9.7B G02G with one S02 screw. G03E G02G G03F VIEWS FROM INSIDE. Screw #S02 VIEWS FROM INSIDE. 9.8A From inside of greenhouse, line up bracing profile bar S23 with holes in profiles G03A and G03H. Secure one S02 screw partially into each end.
  • Page 42 9.9A 9.9B Screw two S14 hex nuts onto bolt on each end. Do not completely tighten. G05D G05D Bolt/Nut #S13 #G05D #S14 9.10A G03F G03G G03F G05D G05D 9.10B Line up G05D channel with U-shaped cutouts in bolts into U-shaped notches and tighten securely. G05D G05D G03G...
  • Page 43: Brace Sides

    Brace Sides Place all the parts for bracing the sides on a level surface. Make sure the pieces are in the correct positions before assembling. Please carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including shoes, gloves and goggles. 10.1A From the inside of the greenhouse, insert long side of cable connector connector to other side of channel.
  • Page 44 10.3A From the inside of the greenhouse, insert long side of cable connector S06 into channel of channel. Use hex key to securely tighten and hold in place. G07A G07A G02A G02A G14D G03A G01C 10.3B 10.3C G03A is tight. Use hex key to securely tighten and hold in place. G03A IMPORTANT: Make sure all corners G01C...
  • Page 45: Install Circular Vent

    Install Circular Vent Lay out all the parts for circular vent in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. 11.1A Open the box containing the parts for the circular vent.
  • Page 46: Install Side And Roof Panels

    Install Side and Roof Panels Lay out all side and roof panels in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. 12.1 Remove protective plastic from both sides of panels GY12 and GY13.
  • Page 47: Install Trim Plates

    Install Trim Plates Lay out the trim plates in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles. 13.1 Remove the six hex nuts from the hex bolts attached to each G09A and G09B trim plate BEFORE installing.
  • Page 48 13.4A In the front of the greenhouse, slide plastic trim plates J02L, J02R, and J03 into connectors P09, P10 and P18 until they snap into place. On top of the greenhouse, snap trim plate J06 onto connector P21. J02L J02R 13.4B Secure trim plate J06 to connector P21 with S43 screw.
  • Page 49: Hang Door

    Hang Door The door has been prepared in Step 2. When hung, the bracing bar is on the inside of the greenhouse. We recommend using two people to hang the door. 14.1A Install hinges to door frame. Line up door hinge P30 with holes G06A DOOR 3G G06A...
  • Page 50 14.2A Place S49 pin in bottom door hinge G06A 14.2B From the outside of the greenhouse, carefully line up hinge on bottom of DOOR 3G with S49 pin on door frame. Lower door onto pin until hinges meet. Push top door back towards door frame so top hinges line up. 14.2C Line up top door hinge with top door frame hinge.
  • Page 51: Secure To Ground

    Secure to Ground sure the foundation is FLAT and LEVEL. Make sure the greenhouse is square. The two diagonal measurements inside the greenhouse should be identical. G01C at each corner and center of both sides. Place the S35 pegs through the holes and into the ground to establish proper placement.
  • Page 52: Install Trays And Bin Holder

    Install Trays and Bin Holder Lay out all the parts for the trays and bin holder in a staging area. Make sure the pieces are in the correct positions before assembling. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles.
  • Page 53 Notes:...
  • Page 54 Clear View 6’ x 8’ Greenhouse Assembly Instructions Please keep this manual in a safe place for reference, service and warranty. If you need any help or have missing or damaged parts, please contact us. Visit www.ecomposter.net for composting solutions.

Table of Contents