Your Postage Meter - Pitney Bowes Connect+ Series Operator's Manual

Hide thumbs Also See for Connect+ Series:
Table of Contents

Advertisement

Your postage meter

The postage meter on your mailing system is a Postal Security Device (PSD) that incorporates the latest
technology approved by Canada Post to secure funds. This technology eliminates the need to perform
physical inspections thereby making the system easier and more convenient to use. The PSD contains
the funds and performs all of the calculations necessary to print postage indicia that comply with the latest
CPC standards.
Canada Post licenses your meter and requires an electronic inspection of the meter. Periodically, your
mailing system will be required to connect to your postage account as a means of inspecting the PSD
(Postal Security Device) and validating information in your mailing system.
To ensure that your operations are not interrupted, the time periods for the Data Center Connection are
pre-established in your system, and will give adequate warning to you when this connection may be
required:
The message "Postal inspection required" will first be shown approximately 21 days after your last
l
connection. You can connect immediately to have the meter inspected or clear the message
temporarily. If you clear the message, you enter a grace period that lasts approximately 7 days.
The "Postal inspection required" message will appear each day for 7 days (when you power-up
l
your system), and will only disappear after a successful connection.
On the 28th day after your last successful connection, your mailing system will display a message
l
indicating that you will not be able to print postage until the inspection is completed.
Follow the prompts on your mailing system to make a successful connection.
l
Pitney Bowes
Operator Guide
February, 2018
Refilling your Meter
Page 201 of 349

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents