After receiving this product, first make sure that the product is well packaged. If you have any
questions, please contact the shipping company or local distributor immediately.
Installation of PV inverters must be performed by professional technician who has been specially
trained, thoroughly read and familiar with all the contents of this manual and familiar with the safety
requirements of the electrical system.
Do not carry out any wiring and inspection or changing components when the power supply is
applied.
Ensure that there is no electromagnetic interference from other electrical and electronic equipment
on the installation site.
Do not refit the inverter unauthorized.
All the electric installation needs to be compliance with the national or local laws and standards.
The temperature of individual parts or the enclosure of the inverter, especially the heat sink, may
become hot in normal operation. There is a danger of burning. Do not touch.
Unit must be reliably grounded before operation.
Do not open the cover of inverters unauthorized. The electrical parts and components inside the
inverter are electrostatic. Take measurements to avoid electrostatic discharge during relevant
operation.
Ensure that DC and AC side circuit breakers have been disconnected and wait at least 5 minutes
before wiring and checking.
Note: Technical personnel who can perform installation, wiring, commissioning, maintenance, troubleshooting and
replacement of the PSW-G series grid-tied solar inverters must meet the following requirements:
Operators need professional training.
Operators must read this manual completely and master the related safety precautions.
Operators need to be familiar with the relevant safety regulations for electrical systems.
Operators need to be fully familiar with the composition and operating principle of the entire grid-tied
photovoltaic power generation system and related standards of the countries/regions in which the project is
located.
Operators must wear personal protective equipment.
Delivery and Installation
Keep the package and unit complete, dry and clean during storage and delivery.
Please remove and install the inverter with two or more people, because of the inverter is heavy.
Remove and install the inverter with appropriate tools to ensure safe and normal operation and
avoid physical injury or death. The people also need mechanical protective measures, such as
protective shoes and work clothes.
Only qualified electricians are allowed to install the inverter.
Do not put and install the inverter on or close to combustible materials.
Keep the installation site away from children and other public places.
Remove the metal jewelry such as ring and bracelet before installation and electrical connection to
avoid electric shock.
Do cover solar modules with light-tight materials before electrical connection. Exposed to
sunlight, solar modules will output dangerous voltage.
www.phocos.com
3 |
P a g e

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Any-Grid Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents