NCB-FL Installation
6.3.5 Router Installation
The NCB-FL router requires the installation of the fiber cable extension between the router module
and the CentreCOM Fiber Optic Transceiver. Perform the installation and cable connections of the
router using the following procedure as a guideline.

Procedure

Step 1. Set the eight router OPTION DIP switches as follows:
Step 2. Route your the Echelon network wires in conduit into the cabinet.
Step 3. Orient the router on the extended JNISCAB-5's top shelf.
Step 4. Connect the fiber cable extension to the CentreCOM transceiver's DB9 connector
Step 5. Orient and place transceiver on the middle shelf as shown in the figure.
Step 6. Mount the CentreCOM transceiver to the shelf using the bracket provided.
Step 7. Route the fiber cable extension under and behind the top shelf up and attach it to the
Step 8. Connect the Ethernet fiber cables to the CentreCOM transceiver's XMT and RCV
Step 9. Connect your Echelon network wires to the router connector labeled NETWORK.
Step 10. Plug the router's transformer power supply into the router's DC power connector.
Step 11. Slide the router and shelf into the cabinet.
Step 12. Plug the router's power transformer into previously installed electrical outlet.
If you find it necessary to disassemble and reassemble your NCB series router for any purpose use
refer
to"NCB Series Router Disassembly/Assembly Procedure" on page
IFI Routers/Repeaters Installation & Operation Manual - P/N: 53388:Rev: A1 5/5/09
a. Set switches 1 through 6 to the UP position.
b. Set switch 7 and 8 to the DOWN position.
The router reads DIP switch settings at power-up or after you press the RESET button.
Figure 6.6 Fiber Cable Extension Installation Diagram
router's AUI connector.