Provide rigid, non-warping mounting
pads or a concrete foundation of
sufficient strength and mass to support
the outdoor unit operating weight (i.e.,
including completed piping, and full
operating charges of refrigerant, oil and
water). Refer to Tables in the General
Information section for unit operating
weights. Once in place, the outdoor unit
must be level within 1/ 4" (6 mm) over its
length and width.
The Trane Company is not responsible
for equipment problems resulting from
an improperly designed or constructed
foundation.
NOTE: To allow for cleaning under the
condensing coil, it is recommended that
an opening be left between the unit base
and the concrete pad.
Fig. III-05 – Recommended Unit Clearances 15-foot bases
Clearances
Provide enough space around the
outdoor unit to allow the installation and
maintenance
personnel
access to all service points. Refer to
submittal drawings
for the unit dimensions. A minimum
of 4 feet (1.2 m) is recommended
for
compressor
service.
sufficient clearance for the opening of
control panel doors. Refer to Figure
18 through Figure 19 for minimum
clearances. In all cases, local codes
which
require
additional
will
take
precedence
recommendations.
unrestricted
Provide
clearances
over
these
25

Advertisement

Table of Contents
loading

Table of Contents