12. Align the monitor assembly to the 4 slotted holes in top cross frame
13. Secure it using 2x M10 hex bolts and washers from the top first, and 4x M5 flange nuts
internally
14. Open the tower base station hatch at the front of the tower
15. Plug in the DVI and power cable for the LCD screen, and connect the grounding point
16. Close the hatch
CAUTION:
Take care when opening this panel as the base stations can be
damaged by shock.
23