LAI Games VIRTUAL RABBIDS THE BIG RIDE Operator's Manual page 19

Table of Contents

Advertisement

18. Open the tower base station hatch at the front of the tower
19. Plug in the DVI and power cable for the LCD screen, and connect the grounding point
20. Close the hatch
CAUTION:
Take care when opening this panel as the base stations can be
damaged by shock.
21. Locate both top side headers, and position them on top of the tower
22. Secure them using 6x M6 screws and washers per header
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents