PRECAUTIONS TO BE TAKEN WHEN WORKING
3 - MOVE THE LOAD AWAY IN HORIZONTAL DIRECTION
With an arm extended forwards and the hand in vertical posi-
tion directed towards the load to be moved away, move the
hand in the direction of the movement to be carried out.
4 - BRING THE LOAD NEARER IN HORIZONTAL DIRECTION
With an arm extended forwards and the hand in vertical posi-
tion directed towards the signalman, move the hand in the di-
rection of the movement to be carried out.
5 - LIFT THE BOOM
With an arm extended in horizontal position and closed fin-
gers, point the thumb upwards.
6 - LOWER THE BOOM
With an arm extended in horizontal position and closed fin-
gers, point the thumb downwards.
7 - SWING THE BOOM
With an arm extended in horizontal position, point the forefin-
ger in the desired swing direction.
8 - SWING THE BOOM
With an arm extended in horizontal position, point the forefin-
ger in the desired swing direction.
52
WEAM012405
RKA15160
RKA15170
RKA15180
RKA15190
RKA15200
RKA15210