Komatsu PC16R-3 Operation & Maintenance Manual page 175

Hydraulic excavators
Table of Contents

Advertisement

8.
Install one shackle in the lifting hole provided in the boom,
then pass the metal cable through it.
9.
Connect the ropes to the upper lifting bar as indicated in the
figure.
IMPORTANT
Always use the three coupling points provided for lifting
q
the machine. Do not lift the machine with swing boom or re-
volving frame.
Pay attention to the pipes and take care that they do not get
q
caught.
10. Lift the machine slowly until the ropes are stretched and
make sure that the fastenings are correct before lifting the
machine definitively.
When lifting the machine, make sure that it is correctly bal-
q
anced and that it remains in horizontal position during the
lifting operations.
Do not lift the machine with swung boom or without using
q
the lifting bar.
CAUTION
WEAM012405
TRANSPORTING THE MACHINE
AE147970
RKA30100
RKA30110
173

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc16r-3hs

Table of Contents