2. Introduction
The commissioning guide is for the PV controller in the ASC series.
There are a few steps to follow when the ASC is configured. During the planning of the commissioning job, it
can be useful to check whether the ASC is installed in the DEIF cabinet or in a customer-designed cabinet.
This document can be used in both cases.
The document contains the AGC terminal numbers even if installed in a switchboard. Please refer to the
switchboard diagrams to see the actual terminal block and terminal number. If in doubt, ask the switchboard
designer.