Recommended Equipment For Start-Up - Siemens SIMOVERT MV Series Commissioning Instructions

Medium-voltage converters with hv-igbt and ihv filter
Table of Contents

Advertisement

4.1

Recommended equipment for start-up

We recommend the following equipment for start-up:
1
2
1
1
1
1
1
1
1
1
1
1
-
48
Multimeter
High-voltage probe for the multimeter, 100 : 1 / 30 kV
Insulation measuring unit with 500/1000/2500/5000 V DC test voltage
Storage oscilloscope with plotter, min. 20 MHz
Clip-on ammeter with analog output for the oscilloscope; we recommend the
HEME 1000
Rotating field measuring unit
Conductivity measuring unit to check the water before the cooling unit is filled
(only for water-cooled drive converters)
Notebook
Connecting cable from the notebook to the CS7-X1 service interface
Calibrator 0 - 20 mA / 0 - 10 V
Software SIMADYN D IBS, program version 5.0
Anti-static equipment
Standard tool, measuring cables, voltage-divider probe for the oscilloscope etc.
Siemens AG
SIMOVERT MV
Commissioning Instructions
6SE8004-0BH76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents