V23 input value = 2
V24 actual value =
Checkback signal, transformer ready (a log. 1
Checkback signal, transformer alarm (a log. 1
Checkback signal, transformer fault (a log. 1
Checkback signal, motor ready (a log. 1
Checkback signal, motor alarm (a log. 1
Checkback signal, motor fault (a log. 1
Checkback signal, cooling unit ready (a log. 1
Checkback signal, cooling unit alarm (a log. 1
Checkback signal, cooling unit fault (a log. 1
External alarm (a log. 1
Checkback signal circuit-breaker OPEN (a log. 1
Command, safety shutdown (a log.1
Select, fixed setpoint bit 0 (a log. 1
Select, fixed setpoint bit 1 (a log 1
Speed/torque control selection (a log 1
Free
V23 input value = 3
V24 actual value = control word of the power-on logic at the periphery
Auxiliaries, ON command
DC link pre-charging
Circuit-breaker CLOSE command
Enable rectifier
Enable inverter
Enable setpoint
Change the ramp-function generator ramp time
Inhibit setpoint
Inhibit inverter
Inhibit rectifier
Circuit-breaker OFF command
Command, discharge DC link
Auxiliaries OFF command
Not assigned
Command, drive converter ON
Not assigned
Siemens AG
6SE8004-0BH76
SIMOVERT MV
Commissioning Instructions
at the power-on logic
ready)
alarm)
fault)
ready)
alarm)
fault)
ready)
alarm)
fault)
alarm)
safety shutdown)
selection)
selection)
speed control)
circuit-breaker is OPEN)