Fp-Grs; Fp-Eal1; Fp-Uls; Fp-Swk - Siemens SIMOVERT MV Series Commissioning Instructions

Medium-voltage converters with hv-igbt and ihv filter
Table of Contents

Advertisement

4.4.3

FP-GRS

♦ Monitoring the DC link pre-charging and discharge
♦ Fault/error messages from the FP GRS
4.4.4

FP-EAL1

♦ Power-on/power-off logic
♦ Evaluation of the drive converter statuses
♦ Sequence for ON, OFF1, OFF2, OFF3
♦ Monitoring times for the DC link
♦ Monitoring- and delay times for the transformer and motor
♦ Monitoring, auxiliaries
♦ Fault and alarm messages from the FP EAL1
The power-on and power-off sequences are described in more detail in Section
5.3.
4.4.5

FP-ULS

♦ Parameterization of the circuit-breaker
♦ Monitoring- and interlocking functions of the circuit-breaker
♦ Fault messages from the FP ULS
4.4.6

FP-SWK

♦ Parameterization of the maximum and minimum speeds
♦ Parameterization of the fixed setpoints, including setpoint
♦ Parameterization of suppression bandwidth 1 and 2
♦ Selection of the setpoint sources
♦ Parameterization of the ramp-function generator
♦ Fault messages from the FP SWK
74
Siemens AG
SIMOVERT MV
Commissioning Instructions
6SE8004-0BH76

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents