Mechanical Installation; What This Chapter Contains; General; Required Tools - ABB ACQ800 Series Hardware Manual

Table of Contents

Advertisement

ACQ800-37 Hardware Manual

Mechanical installation

What this chapter contains

This chapter describes the mechanical installation procedure of the drive.

General

See chapter
free space around the unit.
The unit should be installed in an upright vertical position.
The floor that the unit is installed on should be of non-flammable material, as
smooth as possible, and strong enough to support the weight of the unit. The floor
flatness must be checked with a spirit level before the installation of the cabinets into
their final position. The maximum allowed deviation from the surface level is 5 mm in
every 3 m (0.25 in per 12.5 ft). The installation site should be levelled, if necessary,
as the cabinet is not equipped with adjustable feet.
The wall behind the unit should be of non-flammable material.
Provide the drive with the amount of fresh cooling air given in
Note: Very wide cabinet line-ups (> 4200 mm/165 in) are delivered as shipping
splits.

Required tools

The tools required for moving the unit to its final position, fastening it to the floor and
tightening the connections are listed below.
• crane, fork-lift or pallet truck (check load capacity!); iron bar, jack and rollers
• Pozidrive and Torx (2.5–6 mm) screwdrivers for the tightening of the frame
screws
• torque wrench
• set of wrenches or sockets for joining shipping splits.
Technical data
for allowable operating conditions and requirements for
41
Technical
data.
Mechanical installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acq800-37

Table of Contents