Fig. 13: Cable conductor assignments
Fault indicating and pacing relay option
P_SI_0044
Fig. 14: Cable conductor assignments
7.2.2 Pump, power supply
7.2.3 Other units
Other units
To pin
VDE cable
1
white
2
green
4
brown
Pin assignment
To pin
VDE cable
1
yellow
4
green
3
white
2
brown
1.
Install an emergency cut-off switch or include the pump in the emer‐
gency cut-off management of the system.
2.
Install the pump cable.
–
Key electrical data can be found on the pump name‐
plate.
Install the other units according to their supplied documentation.
Contact
NO (normally open)
NC (normally closed)
C (common)
Contact
NO (normally open)
C (common)
NO (normally open)
C (common)
Installation
CSA cable
white
red
black
Relay
Fault indi‐
cating relay
Fault indi‐
cating relay
Pacing relay
Pacing relay
25