Setting the Hold Cylinder

Turn off incoming air before loosening the hold cylinder. Adjust with a 3/32" Allen wrench. Adjust the hold
cylinder only as far as needed to hold back containers. Over adjustment will cause containers to rock or
tip prior to testing.
The manual adjustment process is now complete. Right: Press () to advance to the Probe Regulator
Setup screen (below) and the standard HMI touch screen adjustment process. To exit directly to the HOME
screen, press the CLOSE/HOME (

Probe Regulator Setup:

Perform the Probe Regulator Setup by verifying that the probe tip is no more than 1/8 inch above the top of the
container. Probe pressure should be about 20 pounds at the beginning. Large mouth containers will require
higher probe pressures.
The Probe Regulator screen will determine whether the probe pressure is too low, too high, or within acceptable
limits. Probe pressure is registered in the graphic where the black line falls across the dial. Pass or fail messages
will appear in the white band as green or red text as shown. Supporting text below may indicate that the Probe
Regulator may require some fine tuning after setup is completed. If the Probe Pressure reading is acceptable,
proceed and scroll on to the Fill Regulator Setup screen (). To exit; press: EXIT AND RESTORE (). Exiting will
return you to the HOME screen.

Guided Setup-Skip Mechanical Instructions (Auto Setup) Option

ALPS SC LINEAR QUICK-START GUIDE
) BUTTON. Refer to page 3-3.
13
To Probe Regulator Setup
REV00 © 02/12/2014
GUIDED SETUP
screen

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SC Linear Leak Tester and is the answer not in the manual?

Questions and answers

Table of Contents