Getting Started - Alps Electric SC Linear Leak Tester Quick Start Manual

Table of Contents

Advertisement

AIR LOGIC POWER SYSTEMS (ALPS)

Getting Started

If not already accomplished insure the following tasks are complete
ALPS SC LINEAR QUICK-START GUIDE
Control box has a safe and addiquate 120 ACV power source. Plug control box
120 ACV power cord into a clean source of 120 ACV power.
90 PSI Air supply is connected, valve is on and Gauge is set for 60 PSI on.
Emergency Stop button is not on or depressed
Boot screen appeared, Select "Go to Main Screen"
"Home Screen" appeared.
3
:
REV00 © 02/12/2014
GETTING STARTED:

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SC Linear Leak Tester and is the answer not in the manual?

Questions and answers

Table of Contents