Sb Flapper Unit (15 Million Sheets); Before Replacing The Alignment Rack (Front)/Alignment Rack (Rear) (15 Million Sheets); Alignment Rack (Front)/Alignment Rack (Rear) (15 Million Sheets) - Canon Perfect Binder-C1 Replacement Manual

For durability enhancement parts finisher, sorter, deliverytray
Table of Contents

Advertisement

2.1.17 SB flapper unit (15 million sheets)

1) Remove the SB flapper unit [1].
- E-rings [2] 2 pcs.
- Bushings [3] 2 pcs.
[1]
[2]
2.1.18 Before replacing the alignment rack (front)/
alignment rack (rear) (15 million sheets)
1) Remove the top cover.
2) Remove the front upper cover. (page 2-3)Reference[Removing the
Front Upper Cover]
3) Remove the rear upper cover. (page 2-4)Reference[Removing the Rear
Upper Cover]
4) Remove the rear cover. (page 2-4)Reference[Removing the Rear Cover]
5) Remove the left upper cover. (page 2-4)Reference[Removing the Left
Upper Cover]
2.1.19 Alignment rack (front)/Alignment rack (rear) (15
million sheets)
1) Remove the harness cover [1].
- 2 screws [2]
[1]
2) Go around to the back of the machine, and then remove the top cover and
rear upper cover.
[3]
[3]
[2]
F-2-44
[2]
F-2-45
3) Remove the E-ring [1], flange [2], belt [3], pulley [4], and parallel pin [5].
0024-6837
CAUTION:
Be careful not to drop parts into the machine.
[5]
[4]
[3]
[2]
[1]
4) Remove the E-ring [1] and bearing [2].
CAUTION:
Be careful not to drop parts into the machine.
0024-6658
0024-6674
5) Disconnect the two connectors [1].
F-2-46
[1]
[2]
F-2-47
F-2-48
Chapter 2
[1]
2-11

Advertisement

Table of Contents
loading

Table of Contents