Replacement Parts In Stacking Tray Assembly; Before Replacing The Sb Flapper Gear (15 Million Sheets); Sb Flapper Gear (15 Million Sheets) - Canon Perfect Binder-C1 Replacement Manual

For durability enhancement parts finisher, sorter, deliverytray
Table of Contents

Advertisement

11) Turn on SW2-2, SW2-3, and SW2-7 [1] on the service PCB and press
the push switch PSW1 [2].
CAUTION:
Pressing the push switch PSW1 operates the trimming blade, pressing plate,
and stack rotation assembly. Be careful not to have your hand and clothes
caught in them.
[2]
[1]
12) Check that the trimming blade [1], pressing plate [2], and stack rotation
assembly [3] operate and that the trimming blade moves to the safe posi-
tion.
13) Remove the fixing bracket [1].
- 2 screws [2]
14) Remove the four screws [1] securing the trimming assembly, and then
draw out the trimming assembly [2].
[1]
[2]

2.1.13 Replacement parts in stacking tray assembly

No.
Parts Name
[1]
SB flapper Gear
[2]
SB flapper unit
LED1
LED2 LED3
PSW1
PSW2
PSW3
SW1
1
2 3
4
SW2
1 2 3 4 5 6 7 8
F-2-34
[2]
[1]
F-2-35
F-2-36
T-2-1
Q'ty
1
1
No.
[3]
[4]
[5]
2.1.14 Before replacing the SB flapper gear (15 million
sheets)
1) Remove the top cover.
2) Remove the front upper cover. (page 2-3)Reference[Removing the
Front Upper Cover]
3) Remove the rear upper cover. (page 2-4)Reference[Removing the Rear
Upper Cover]

2.1.15 SB flapper gear (15 million sheets)

1) Remove the frame upper cover [1].
- 4 screws [2]
2) Remove the top cover switch [1].
- 2 screws [2]
[2]
[1]
0024-6650
Parts Name
Alignment rack (front)
Alignment rack (rear)
Alignment motor
[2]
F-2-37
[1]
F-2-38
Chapter 2
Q'ty
1
1
2
0024-6653
0024-6657
[1]
2-9

Advertisement

Table of Contents
loading

Table of Contents