Before Replacing The Sb Flapper Unit (15 Million Sheets) - Canon Perfect Binder-C1 Replacement Manual

For durability enhancement parts finisher, sorter, deliverytray
Table of Contents

Advertisement

Chapter 2
3) Remove the top cover mount [1].
- 5 screws [2]
[2]
[1]
4) Release the harness from the three wire saddles [1], and then remove the
six connectors [2].
[2]
[1]
5) Remove the switch-back flapper motor assembly.
- 2 screws [2]
[1]
2-10
[2]
F-2-39
[2]
[2]
F-2-40
[2]
[2]
F-2-41
6) Remove the SB flapper gear [2].
- E-ring [1]
- Straight pin [3]
[1]
CAUTION:
While reassembling, attach the SB flapper gear so that the sensor flag of the
gear is positioned downwards when the flapper hangs down.
2.1.16 Before replacing the SB flapper unit (15 million
sheets)
1) Remove the top cover.
2) Remove the front upper cover. (page 2-3)Reference[Removing the
Front Upper Cover]
3) Remove the rear upper cover. (page 2-4)Reference[Removing the Rear
Upper Cover]
4) Remove the SB flapper gear. (page 2-9)Reference[SB flapper gear (15
million sheets)]
[2]
[3]
F-2-42
F-2-43
0024-6836

Advertisement

Table of Contents
loading

Table of Contents