Bosch Rexroth Sytronix MPA01 Operating Instructions Manual page 41

Motor-pump unit
Table of Contents

Advertisement

DOK-SYTROX-MPA01******-IT02-EN-P
Rexroth Sytronix SvP 70xx Motor-Pump Unit MPA01
LSA Control S.L. www.lsa-control.com comercial@lsa-control.com (+34) 960 62 43 01
PGH
Bearing time / months
Measures for commissioning
> 9
> 24
> 60
Let the internal gear pump in its delivery state (moistened with
mineral oil)
Fill the internal gear pump with mineral oil
Before mounting, check the complete internal gear pump for dam‐
age and corrosion.
At a test run, check the internal gear pump for functionality and
leakproofness.
In the case of a storage time > 24 months, change the shaft seal‐
ing ring.
After the maximum storage time we recommend a preventive
check of the internal gear pump with change of the sealings by
the responsible Rexroth service!
Tab.6-7:
Measures before commissioning pumps that have been stored over a
prolonged period of time
Bosch Rexroth AG
39/123
Transport and Storage

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rexroth sytronix svp 70 series

Table of Contents