Figure 3-8: Gui Login; Figure 3-9: Management Server - Baicells Nova-233 G2 Installation Installation

Outdoor 2x1w tdd enodeb
Hide thumbs Also See for Nova-233 G2:
Table of Contents

Advertisement

Figure 3-8: GUI Login

2. Configure the eNB to connect to the Baicells CloudCore:
a. Go to the BTS Settings > Management Server menu (Figure 3-9).
b. Enter baiomc.cloudapp.net:48080/smallcell/AcsService as the management
server.
c. Enter your unique CloudKey that was provided by Baicells. The CloudKey is
operator-specific and enables devices, upon power up, to be added
automatically to your OMC account.

Figure 3-9: Management Server

3. Configure the network interfaces. Go to the Network > WAN/LAN menu (Figure 3-10).
a. WAN
i. Ensure the Interface name is set to WAN.
ii. Enter one or more Domain Name Server (DNS) IP addresses.
iii. Set the Connect Type to either Copper or Fiber, per your backhaul
network.
iv. The eNB can use one of 3 connection services: DHCP, PPPoE, or Static IP,
as described below. Choose a Connect Via option for this eNB.
Dynamic Host Configuration Protocol (DHCP) – The eNB's IP
address will be obtained dynamically from the local DHCP server.
The current DHCP server IP address will be displayed, along with
the link speed. When DHCP is selected as the connection
method, there are no further WAN fields to configure in this
window.
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents