Download Print this page

Installation Instructions - olympia electronics GR-939/30L/LT Quick Start Manual

Waterproof self testing maintained emergency luminaires

Advertisement

1
4
7
Step 1. Remove the diffusor. Place a flat blade screwdriver and pull the reflector gently (with
opposite orientation in relation to the plastic base).
Step 2. Install the included plastic cover in to the unused hole and install the base plastic (with
the included mounting screws and plugs).
Step 3. Always use in any case round mains cable, with a diameter of 6-9mm (H05RN-F
type 2x1mm² or any other type, at least equal to it's mechanical and electrical properties).
ATTENTION!! The cable must not be deformed in any way (This requirement is important
to ensure the tightness isolation IP65). Install the cable gland, pass the round cable thru and
tighten it all the way. When fastening the cable gland retain the main body of the gland in a
steady position and rotate only the internal plastic screw, this will prevent the rubber grommet
from being damaged.
Step 4. Place the battery's connector to the corresponding connector on the P.C.B.
Step 5. Connect the mains cables to the respective terminal block (connect the ground wire if
required). Ν for neutral, L for Live Wire and L1 for the maintained operation. The L1 wire
can be connected to an external switch to control the maintained or non maintained operation of
the luminaire. For permanent maintained operation use two wires to power the luminaire, Ν for
neutral and L for Live Wire, and Link the L and L1.
Step 6. Install the included tie (if needed) to fasten securely the power cables.
Step 7. Refit the reflector and fasten the two small screws (included).
Step 8. Finally place the diffusor by using the 4 screws (tightening torque 1.2Nm).
Step 9. Manual TEST or Resetting Errors
In order to test or reset the device you must carefully remove the diffusor by unfastening the 4
mounting screws. Then push the button as described in the according paragraphs on page 1 and
2.
NOTE!! After finishing the installation you must power the luminaire at least for 24 hours
for battery charging to perform the nominal autonomy.
Page 3 from 5

INSTALLATION INSTRUCTIONS

2
5
L1 L N
8
8
3
6
9
923939016_09_007

Advertisement

loading

This manual is also suitable for:

Gr-938/30l/lt