Installation Instructions - olympia electronics BAU LIGHT Series Manual

Self testing maintained emergency luminaires

Advertisement

1 2 3 4
Maintained operation
6
1 2 3 4
Non-maintained operation
1 Place a flat blade screwdriver to the plastic hook and pull up
gently to release the diffusor.
2 Remove the reflector.
3 Remove the led strip.
4 Use the included mounting parts to mount the base plastic.
5 Always use in any case round mains cable, with a diameter of 5-10mm (H05RN-F type 2x1mm²
or any other type, at least equal to it's mechanical and electrical properties). ATTENTION!! The
cable must not be deformed in any way (This requirement is important to ensure the ΙΡ rating).
Install the included gasket in to the cable entry holes (verify that is not deformed). Make a hole in the
center by using a small screwdriver. Pass the round cable through the gasket. Connect the mains
cables to the respective terminal block. Ν for neutral, L for live wire.
6 The control of maintained or non maintained operation of the luminary is achieved through Switch 4 of
DS1. For maintained operation, switch number 4 must be in ON position. For non-maintained operation,
switch number 4 must be in OFF position.
7 Refit the led strip minding the connection with the P.C.B. Warning!! The holes of the led strip must be
fit in the projections of the base.
8 Place the battery's connector to the corresponding connector on the P.C.B.
Refit the reflector (mind the correct orientation) and tighten the screws. Refit the diffusor (mind
9
the correct orientation) and the luminary is ready to operate.
NOTE!! After finishing the installation you must power the luminaire at least for 24 hours for battery
charging to perform the named autonomy.
Mounting methods
BAU Light luminaries can be surface mounted on walls or ceilings. For these mounted installations,
special accessories are included.
Wall
bottom
view
Page 4 from 5

INSTALLATION INSTRUCTIONS

1
Wall installation
4
7
Ceiling
Ceiling installation
8
9
923753004_09_001

Advertisement

loading

This manual is also suitable for:

Bau light gr-750/st/hp/ll/wlBau light gr-751/st/lp/ll/wlBau light gr-752/st/hp/hl/wlBau light gr-753/st/lp/hl/wlGr-750/st/hp/ll/adrGr-751/st/lp/ll/adr ... Show all