Download Print this page

Installation Instructions - olympia electronics GR-490/ADR Manual

Addressable self testing non-maintained emergency ceiling mounted luminaires

Advertisement

1
Initial installation
1. Detach the front cover by applying pressure using a flat blade screw driver. Next, unfasten the four
retaining screws without removing them and remove the diffusor.
2. Install the battery connector to its corresponding connector on the main pcb.
3. Install the cable grommet in the open hole of the plastic base and open a hole in the center of the
grommet using a small screw driver. Pass the power cable through the hole in the grommet, connect the
cables as shown in the photograph. Open another cutout cable entry hole and install the second supplied
cable grommet. Use the supplied self adhesive pad and cable tie to anchor the cable. Pass the 2 signal
cables and connect them on the A, B terminals minding the correct polarity. Set the luminaire's address
through the DIP switch. See table at pages to
4 Reinstall the diffusor and re-tighten the 4 screws in a diagonally manner with a torque of
.
NOTE!! After finishing the installation you must power the luminaire for at least 24 hours in order
to completely charge the battery. The rated autonomy duration can be achieved after that time.
GR-490/ADR, GR-492/WP/ADR
Corridor
lighting
ATTENTION!!!
During installation follow this light
direction.
Page 3 from 9

INSTALLATION INSTRUCTIONS

cable
3
entry
hole
7
9
2
N
PE
L
A
B
GR-491/ADR, GR-493/ADR
Open
area
lighting
0,9
N*m
.
923493003_09_001

Advertisement

loading

This manual is also suitable for:

Gr-491/adrGr-492/adrGr-493/adr