Nortel 8000 Series Installing And Maintaining page 51

Ethernet routing switch
Hide thumbs Also See for 8000 Series:
Table of Contents

Advertisement

6
7
8
Installing and Maintaining the Ethernet Routing Switch 8000 Series Chassis
Copyright © 2008, Nortel Networks
.
If the holes in the vertical supports require clip nuts, insert a clip
nut in each of the 12 locations.
WARNING
Risk of personal injury
It requires three people to lift the 8010co chassis. To make the
chassis lighter, remove the modules and power supplies before
you lift it.
Lift the 8010co chassis onto the installation shelf.
Hold the 8010co chassis in position and align the flanged end of
the chassis mounting rail with the six holes on either side of the
vertical rack support.
For more information about installing the chassis, see
8010co chassis in a 19-in. two-post rack" (page
Nortel Ethernet Routing Switch 8600
NN46205-303 01.02 Standard
4.1 10 January 2008
Mounting the chassis in a two-post rack 51
"Installing the
52).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8010co800380068010

Table of Contents