Toro MultiPro 1750 Operator's Manual page 69

Turf sprayer
Table of Contents

Advertisement

Figure 81
1. Flange clamp
2. Gasket
3. Manifold (agitation valve)
4. Flange
(manifold—agitation-bypass
valve)
5. Flanged-head bolt
6. Valve mount
2.
Assemble the agitation-bypass valve, gasket,
and agitation-valve manifold with a clamp
tightened by hand
3.
Align a gasket between the flanges of the
rate-control valve and the agitation-valve
manifold
(Figure
81B).
4.
Assemble the gasket and agitation-valve
manifold with a clamp tightened by hand
81B).
5.
Align a gasket between the flanges of the
agitation-valve manifold and the master-section
valve
(Figure
81B).
6.
Assemble the agitation-valve manifold, gasket,
and master-section valve with a clamp tightened
by hand
(Figure
81B).
7.
Assemble the agitation-valve manifold and
socket with a clamp tightened by hand
81C).
7. Flanged locknut
8. Flange (rate-control valve)
9. Flange (master-section
valve)
10. Retainer
11. Socket (outlet fitting)
(Figure
81A).
(Figure
(Figure
8.
Secure the end-cap fitting to the outlet fitting by
inserting a retainer into the socket of the outlet
fitting
(Figure
9.
Assemble the agitation valve to the valve mount
with the flanged-head bolt and flanged locknut
that you removed in step
Agitation-Manifold Valve (page 63)
the nut and bolt to 1017 to 1243 N∙cm (90 to
110 in-lb).
10.
If you loosened the mounting hardware for the
master-section valve, tighten the nut and bolt to
1978 to 2542 N∙cm (175 to 225 in-lb).
Installing the
Master-Section-Manifold Valve
1.
Align the flange of the master-section-valve
manifold, 1 gasket, and the flange of the
master-section-bypass valve
g033329
1. Flange clamp
2. Gasket
3. Manifold (master-section
valve)
4. Flange
(bypass—master-section
valve)
5. Flanged-head bolt
69
81C).
3
of
Removing the
and torque
(Figure
Figure 82
6. Valve mount
7. Flanged locknut
8. Flange (agitation valve)
9. Retainer
10. Socket (outlet fitting)
82A).
g033330

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents