14. Run the system for the desired test duration.
For example 5-10 minutes.
15. When you have completed acceptance testing lower the active and reactive load levels
in 10% increments back down to 0 using the Active power slider and Reactive power
sliders.
Transfer the system back to VF mode in order to return the UPS back to normal system
operation.
16. Disable PQ mode (System Menu > System > System Type > PQ Mode).
17. The PQ Mode screen appears:
18. Select Disable and then select Confirm.
UPS for 208 Vac Grid, B60US-IB Installation Guide, doc. rel. 3.0

Figure 45: Reactive load testing

Figure 46: Disable PQ mode

59