For additional information about responding to Alarm indications, refer to the
Troubleshooting Guide.
Next perform a brief battery test to verify that The UPS is ready and it is able to operate in
battery mode when needed.
28. Perform a brief battery test to verify that the UPS is ready and able to operate in battery
mode when it is needed (Operation > Battery test > Test battery).
The Test in Progress screen appears:
29. Press Test Battery.
The Test in Progress screen appears:
UPS for 208 Vac Grid, Installation Guide, doc. rel. 3.0
Figure 33: The "alarms" icon indicates alarm conditions
Figure 34: Next scheduled test screen
50