17-3. Install the five connectors to SY-1 board ass'y (Compl pwb SY-1) 202 .
17-4. Install Ferrite core 51 to four cables, except DC24V power cable ass'y 160 and Power/ I-O cable ass'y 157 , using
Binder 63 .
Note1: Install the parts referring to the following pictures.
Note2: Make sure to install Ferrite core 51 without catiching cables.
Connector cable
(Orange, Yellow, Green, Gray, White)
17-5. Install SY-1 board ass'y (Compl pwb SY-1) 202 to Base 2 , then tighten Screws 111 (x4).
Torque: 120 cN•m (12.2 kgf•cm)
Apply Screw lock after tightening screws.
Note1: Tighten the screw installing the SY-1 board ass'y (Compl pwb SY-1) together with the earth lug wire on the
back of SY-1 board ass'y (Compl pwb SY-1).
Note2: Revised SY-1 board ass'y (Compl pwb SY-1) does not have the earth lug wire.
202
SY-1 board ass'y
(Compl pwb SY-1)
111
111
Figure of Step 17-5
202
SY-1 board ass'y
(Compl pwb SY-1)
Figure of Steps 17-3 and 17-4
Grounding wire
111
Screws
3x6 mm (x4)
308
2
Installation of SY-1 board ass'y
(Compl pwb SY-1) is complete
Connector cable
(Orange, Yellow,
Green, Gray, White)
Screw lock
(x4)
160
DV24V power cable ass'y
(not passing through
the ferrite core)
Ferrite core installed
157
Power/ I-O cable ass'y
Base
(not passing through
the ferrite core)
Bottom View of
SY-1 board ass'y
(Compl pwb SY-1)
*Make sure of the installation
of the grounding wire.
–43–
63
Binder
51
Ferrite core