Document Revision History - Carrier UC Open Installation And Startup Manual

Table of Contents

Advertisement

Document revision history

Document revision history
Important changes to this document are listed below. Minor changes such as typographical or formatting errors are not
listed.
Date
Topic
Wiring devices to the UC Open's Rnet
1/25/19
port
Specifications
10/29/18
Wiring inputs and outputs > Input
wiring specifications and To wire inputs
and outputs
Wiring devices to the UC Open's Rnet
port
Specifications
2/24/17
1/18/17
Wireless sensor overview
To install the Wireless Adapter for
Wireless sensors
Wiring devices to the UC Open's Rnet
port
Input wiring specifications
To wire the controller to the network
Wiring for communications
Specifications
Cover
What is the UC Open?
2/22/16
Local access to the UC Open
8/4/14
Specifications
Wiring devices to the Rnet port
Connecting an SPT sensor
To wire an Equipment Touch to the UC
Open
BACview devices
Local Access to the UC Open
To wire the Equipment Touch to the UC
Open
Restore factory defaults
* For internal use only
UC Open
Installation and Start-up Guide
Change description
Removed star configuration from the first paragraph.
Added surge CAUTION to Protection specification.
Removed SPT sensor from Input wiring table, added TruVu™ ET
Display, and referred user to the device's Installation and Start-up
Guide.
Combined overview and wiring on the zone sensors and
touchscreen devices. Added TruVu™ ET Display.
Reworded Rnet port specification and added power supplied by
Rnet port.
Added first paragraph to Protection specification.
Changed all "WS" to "wireless".
New topics
Added Wireless Adapter, wireless sensors
Added Wireless Adapter for wireless sensors
Added BACnet ARC156 connection information.
Changed from Wiring the UC Open to the MS/TP network
Added BACnet ARC156 and updated Rnet port information to
include Wireless Adapter.
Changed to latest controller image.
Added USB Link wiring caution.
Maximum number of BACnet third-party integration points using
Snap - changed to unlimited, depending on memory
Power - removed references to BACview
Rnet port - added Equipment Touch and removed BACview
Rnet port - added note that number of possible ZS sensors you
can have with an Equipment Touch is 15
Local Access port - removed BACview, added Equipment Touch
Changed from "Wiring a communicating zone sensor to the UC
Open"
Removed BACview
Removed BACview and added Equipment Touch
New topic
Removed references and topics
Removed BACview and added Equipment Touch
Added Caution to maintain polarity and use the power supply only
for Carrier controllers
Added information on using the Factory Defaults jumper
24
Code*
X-TS-TS-O
X-TS-AK-E-CC
C-D
C-D
X-H-JS-O
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-D
C-TS-RD-E-JH
C-D-LJ-O
C-TS-RD-E
C-D-LJ-E-RD
CARRIER CORPORATION ©2019
All rights reserved

Advertisement

Table of Contents
loading

Table of Contents