Installing The Din Rail Mount Transmitter; Overview; Determining An Appropriate Location; Temperature Requirements - Emerson Micro Motion LF Series Installation Manual

Flowmeter
Table of Contents

Advertisement

Chapter 4

Installing the DIN Rail Mount Transmitter

4.1

Overview

This chapter describes how to install LF-Series DIN rail mount transmitters. The following general
steps are required:
Determine the location of the transmitter and other flowmeter components (see Section 4.2)
Mount the transmitter (see Section 4.3)
Ground the transmitter (see Section 4.4)
Supply power to the flowmeter (see Section 4.5)
4.2

Determining an appropriate location

See Figure 4.2.5 for the DIN rail mount installation architecture.
To determine an appropriate location for the transmitter, you must consider the temperature
requirements of the transmitter, hazardous area issues, location of power source, cable lengths, and
accessibility for maintenance.
Figure 4-1
Installation architecture
Eurofast connector
(supplied with Micro Motion cable)
LF-Series sensor
4.2.1

Temperature requirements

Install the transmitter in an environment where ambient temperature is between –40 and +131 °F
(–40 and +55 °C).
LF-Series Flowmeters: Sensor/Transmitter Installation
Hazardous area
4-wire cable
Safe area
LF-Series DIN
transmitter (top view)
17

Advertisement

Table of Contents
loading

Table of Contents