Tiger CNH T6010-80 Mounting And Operating Instructions page 70

Assemblies for cnh t6010-80, maxxum 110,115,120,125,130,140,155
Hide thumbs Also See for CNH T6010-80:
Table of Contents

Advertisement

SWIVEL BRACKET MOUNTING
Install the boom swivel bracket onto the boom mounting bracket with the swivel pin. Secure
the pin in place using the capscrews, etc. through the hole in the boss and pin. NOTE: The head
of the capscrew must be toward the front of the tractor.
Install all new swivels and fittings on the swing cylinder with swivel openings facing each
other. Fittings will vary in type and direction depending on your application, refer to your parts
section for more details.
Install bearings in the main frame anchor for the swing cylinder. This may already be done
for you.
Install the swing cylinder between the boom mounting bracket cylinder anchor and the boom
swivel with the pins. Insert roll pins through the top and the bottom hole in the pins.
Now the hoses can be attached from the control valve to the swing cylinder.
Install the boom swivel into the main frame as shown in the parts section using a hoist. Line up holes
in swivel and main frame for large swivel pin and insert pin. Secure with hardware as shown.
Attach the inner end of the main boom to the swivel bracket with the cylinder anchors positioned
upward, and at a right angle to the tractor. Secure it with the horizontal hinge pin. Secure the hinge pin in
the boss with capscrews, etc. (see Parts Section).
Attach the butt end of the main boom cylinder to the swivel with the cylinder pin and roll pins shown in
the Parts Section.
Install the travel lock on the rod end of the main boom cylinder. This should be facing the butt end of
the cylinder after installation.
Install the fittings and hoses to the main boom cylinder per Parts Section.
GREASE HINGE PIN ZERKS ON BOOM AFTER ASSEMBLY, ONCE UNDER LOAD WITH BOOM
ELEVATED AND AGAIN AT REST WITH BOOM SUPPORTED
Attach the head to the secondary boom using the pins and hardware shown in the Parts
Section. Install the deck pivot cylinder using the pins and hardware also shown in the Parts
Section.
Connect the fittings and hoses from the pivot cylinder to the small preformed tubes on the
boom arm. Connect the fittings and hoses from the motor to the large preformed tubes on the
boom arm. If attaching a rotary mower make sure that the hose with the red strip sticker is
attached to the motor pressure port which is marked with a red dot sticker.
Connect all remaining hoses from the control balbe to the cylinders and/or preformed tubes
on the boom arm.
(ASM-C-0086)
ASSEMBLY
MAIN BOOM INSTALLATION
DECK ATTACHMENT
Assembly Section 2-38
(ASM-C-0015)
(ASM-C-0013)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bengal brute

Table of Contents