Foundation Procedure - Circontrol CCL-PT3 SMART Installation Manual

Semi fast charge station for electric vehicles
Table of Contents

Advertisement

INSTALLATION MANUAL –CCL-PT3 SMART & CCL-PT3 SMART 3G–
6.3

FOUNDATION PROCEDURE

STEP
ACTION
The four "L" threaded bars must be placed and cemented underground in
the foundation place as shows bellow figure.
1
Drawing foundation dimensions are minimum recommended to fix post
to the ground, please consider hardness ground conditions.