3. Installation

3.3.3 Connecting the supply and work lines

3-12
Please note
Seal all connections not required for the functioning of
the CPV-SC valve terminal with blanking plugs.
In the case of valves which are not used, seal connec-
tions 2 and 4 with blanking plugs.
Connect the work lines as follows, depending on the tool
you are using:
– Screw connector with hexagon socket head: any se-
quence is possible.
– Screw connector with external hexagon socket head:
connection must be made from left to right (space for
wrench).
– The double-solenoid valve (Ident. Code "J") consists of
two components, the "control valve" and the "work
valve". Each valve has its own housing. The control valve
is situated to the left of the "work valve" and does not
have any work connections.
Fit the screw connector or the silencers according to the table
below. Then connect the pneumatic tubing.
Festo P.BE-CPVSC-EN en 0112NH