Installation; Installation Location; Installing The Probe Directly Into The Process - E+E Elektronik EE381 Manual

Transmitter / switch for moisture content in oil
Hide thumbs Also See for EE381:
Table of Contents

Advertisement

Available languages

Available languages

Manual english
3.

INSTALLATION

3.1

Installation location

Select a location that offers optimum measuring conditions. The oil must be able to circulate freely around the sensing element.
Mount the transmitter directly into the circulating system and not into a reservoir.
3.2

Installing the probe directly into the process

When installing a probe directly into the process, there should be a stop valve on both sides of the point of installation.
This makes it easy to remove the transmitter for maintenance and calibration.
Step 1:
Install the probe with the stop valves closed.
It is not permitted to use a sealing ring with a NPT 1/2" thread.
Appropriate PTFE sealing tape or sealant should be used instead.
Step 2:
Insert the probe into the process and screw it as tight as possible by hand.
Step 3:
If there is a sealing ring, check it for correct centring and tighten the
screw connection with a torque of 30 Nm.
page 20
EE381

Advertisement

Table of Contents
loading

Table of Contents