RSG920P operates properly and safely. The permissible ambient conditions must be complied with. The
information in the relevant document must be observed.
IMPORTANT!
Do not install the RUGGEDCOM RSG920P in a nuclear power plant or other nuclear-related facilities.
IMPORTANT!
The RUGGEDCOM RSG920P must be located in an area accessible only by qualified service personnel or
other authorized users. Operation of the device is permitted only when this requirement is met.
CONTENTS
Section 2.1, "General Procedure"
Section 2.2, "Unpacking the Device"
Section 2.3, "Installing the Device in Hazardous Locations"
Section 2.4, "Mounting the Device"
Section 2.5, "Grounding the Device"
Section 2.6, "Connecting the Failsafe Alarm Relay"
Section 2.7, "Connecting the Digital Inputs"
Section 2.8, "Connecting Power"
Section 2.1

General Procedure

The general procedure for installing the device is as follows:
1.
Review the relevant certification information for any regulatory requirements. For more information, refer to
Section 6.1,
"Approvals".
2.
Mount the device.
3.
Connect the failsafe alarm relay.
4.
Connect the digital inputs.
5.
Connect power to the device and ground the device to safety Earth.
6.
Connect the device to the network.
7.
Configure the device.
Section 2.2

Unpacking the Device

When unpacking the device, do the following:
1.
Inspect the package for damage before opening it.
2.
Visually inspect each item in the package for any physical damage.